- NDT Awareness for engineer.
- NDT Awareness for Managers.
- NDT Application in Industry.
- ASNT Visual Testing Level I/II.
- ASNT Penetrant testing Level I/II.
- ASNT Magnetic particle Testing Level I/II.
- ASNT Eddy Current testing Level I/II.
- ASNT Ultrasonic testing Level I/II.
- ASNT Radiography testing Level I/II.
- PAUT Training
- TOFD Training
- NDT procedure preparation as per ASME sec.V, VIII. Or customer specification
- How to prepare calibration block as per ASME Sec V
- Radiation Safety for Industrial worker.
- Radiation Safety for Industrial Radiographer
- NDT documentation for NDT engineer.
- Testing-DT & NDT
- Importance of NDT in Manufacturing Process.
- Training & Certification of personnel as per employer’s written practice
- Calibration in NDE
- Manufacturing Process & Defect. (Casting, Welding, Forging, Seamless tube, Plate)
- Process audit, Product audit, Vendor audit.
- Quality control/assurance –For QC Engg. (Raw material to final inspection, Responsibility of QC engg. Equipment’s and gauges, 6 sigma awareness, FMEA, 7 QC Tools, Process audit, product audit, Vendor audit. NDT awareness, Manufacturing process Defect.)
- Drawing reading for QC Engg.
- Calibration.(Equipment’s and Gauges)
- Customer satisfaction.
- Inspection Techniques (How to improve inspection )
- Team work
- Root Cause Analysis.
- 8 D -structured problem solving.
- Statistical Process control (SPC)
- Poke–yoke
- 6 - Sigma Awareness. (How to improve quality, reduce Problem)
- FMEA
- 7 QC Tool.
- Visual Inspection. (Requirements, Equipment’s, Inspection during, Before, after.)
Welding Training
- Preparation WPS/PQR, Welder Qualification.
- Welding consumable estimation (Based on Drg.)
- Preparation of welding consumable specification for procurement And testing. As per ASME Sec IIC And customer Requirement.
- Preparation of shop weld plan.
- Preparation of weld repair plan.
- Preparation of heat treatment procedure.
- Preparation of welding sequence for critical joint and distortion Controls.
- Preparation of gas cutting procedure.
- Preparation for plasma cutting procedure.
- Drawing Reading.
Welding Procedure
- Preparation WPS/PQR, Welder Qualification.
- Welding consumable estimation(Based on Drg)
- Preparation of welding consumable specification for procurement And testing. As per ASME Sec IIC And customer requirement.
- Preparation of shop weld plan.
- Preparation of weld repair plan.
- Preparation of heat treatment procedure.
- Preparation of welding sequence for critical joint and distortion Control.
- Preparation of gas cutting procedure.
- Preparation for plasma cutting procedure.